Risk Assessment and Management in Build Operate Transfer (BOT) Infrastructure Projects

AUTHORS & AFFILIATIONS

Dr. Prathmesh Vilas Patil Civil Engineering Department, Atma Malik Institute of Technology & Research, Shahapur, Dist. Thane, Maharashtra, India Corresponding authorORCID ↗
Mr. Rohan Dnyandev More Civil Engineering and Planning, Pravin Rohidas Patil College of Engineering and Technology, India
Mr. Milind N. Telavane Civil Engineering Department, Shivajirao S Jondhle College of Engineering and Technology, Asangaon, Dist. Thane, Maharashtra, India

READER ENGAGEMENT

Article metrics

Source-labelled data
61Article / abstract viewsOJS COUNTER usage records
27PDF downloadsOJS COUNTER usage records
61Views · last 30 daysOJS COUNTER usage records
27PDF downloads · last 30 daysOJS COUNTER usage records

Usage totals reflect processed OJS records and may lag recent visits. Citation sources count independently and are not combined.

Abstract

Build Operate Transfer infrastructure contracts expose public authorities, concessionaires and lenders to interacting construction, revenue and financing uncertainties. This article develops a simulation-based framework for screening risks, assessing financial consequences and comparing mitigation measures in an illustrative toll-road concession. No field survey or operating-project dataset is used. Eight risk categories are screened using assumed occurrence probabilities and conditional impacts. A reproducible Monte Carlo model generates 10,000 paired scenarios for capital expenditure, demand, operating cost, borrowing rates and commissioning delay. The baseline probability of stabilized debt-service coverage falling below unity is 42.2%, compared with 24.3% under an assumed mitigation package. Median project net present value changes from INR -308.6 crore to INR -233.8 crore after including an incremental mitigation cost. Demand and capital expenditure emerge as influential drivers of debt-service coverage within the specified model. The findings demonstrate a transparent assessment method rather than observed project performance. Contract-specific calibration, cash-flow scheduling and independent validation are required before applying the framework to investment or concession decisions.

FULL TEXT

Read the article

DOWNLOAD PAPER

Published

09-10-2026

How to Cite

Patil, D. P. V., Mr. Rohan Dnyandev More, & Mr. Milind N. Telavane. (2026). Risk Assessment and Management in Build Operate Transfer (BOT) Infrastructure Projects. Journal of Scientific Research and Technology, 4(10), 1–8. https://doi.org/10.5281/zenodo.23269056
SCHOLARLY DISCOVERY

Follow the research record

Check article metadata and journal source records in their original services.

Clarivate Web of ScienceWeb of ScienceESCI till 2024 · historical verification PDF ↗ Google ScholarGoogle ScholarJournal profile ↗ CrossrefCrossrefDOI records ↗ ResearchGateResearchGateJournal page ↗ ISSN International CentreISSN 2583-8660Official serial record ↗ SciSpaceSciSpaceJournal record ↗ OpenAlexOpenAlexScholarly source record ↗ ScilitScilitJournal source record ↗ Semantic ScholarSemantic ScholarTitle search ↗ Academia.eduAcademia.eduJSRT profile ↗ ROADROADISSN directory record ↗ SJIFactorSJIFactorJournal listing ↗ Cresta MetricsCresta MetricsJournal profile ↗ ZenodoZenodoISSN search ↗ OpenAIREOpenAIRE-connected recordZenodo source record ↗ International Impact Factor ServicesIIFSService reference ↗